发明授权
EP0228463B1 METHOD AND APPARATUS FOR IMPROVED START-UP PROCEDURES IN CONVENTIONAL STEAM POWER GENERATORS AND DUAL FLUID CHENG CYCLE ENGINES 失效
传统蒸汽发电机和双流体循环发动机改进启动程序的方法与装置

METHOD AND APPARATUS FOR IMPROVED START-UP PROCEDURES IN CONVENTIONAL STEAM POWER GENERATORS AND DUAL FLUID CHENG CYCLE ENGINES
摘要:
An improved procedure for cold start-up of closed loop boiler set and Cheng cycle system wherein the venting step, the boiler swelling problem and blowdown step of the conventional start-up are eliminated by use of an external pressure source (40) to increase the operating pressure in the evaporator section (12) which minimizes premature phase change and accompanying volume increase.
信息查询
0/0