发明授权
EP1374252B1 A NUCLEAR POWER PLANT AND A METHOD OF CONDITIONING ITS POWER GENERATION CIRCUIT
有权
核反应堆系统和方法用于调节电力生成电路
- 专利标题: A NUCLEAR POWER PLANT AND A METHOD OF CONDITIONING ITS POWER GENERATION CIRCUIT
- 专利标题(中): 核反应堆系统和方法用于调节电力生成电路
-
申请号: EP02718428.2申请日: 2002-03-27
-
公开(公告)号: EP1374252B1公开(公告)日: 2007-05-02
- 发明人: CORREIA, Michael , KRIEL, Willem Adriaan Odendaal
- 申请人: Pebble Bed Modular Reactor (Proprietary) Limited
- 申请人地址: 3rd Floor, Lake Buena Vista Building, 1267 Gordon Hood Avenue, Centurion Centre 0046 Centurion ZA
- 专利权人: Pebble Bed Modular Reactor (Proprietary) Limited
- 当前专利权人: Pebble Bed Modular Reactor (Proprietary) Limited
- 当前专利权人地址: 3rd Floor, Lake Buena Vista Building, 1267 Gordon Hood Avenue, Centurion Centre 0046 Centurion ZA
- 代理机构: Finnie, Peter John
- 优先权: ZA200102646 20010330
- 国际公布: WO2002080189 20021010
- 主分类号: G21D1/02
- IPC分类号: G21D1/02 ; F02C1/05
摘要:
In a nuclear power plant making use of a high temperature gas cooled reactor, it is necessary, prior to commencing power generation and connection of a generator to an electrical distribution grid, to condition the power generation circuit of the plant. This involves creating stable conditions within the power generation circuit. To this end, the plant includes a start-up blower system for circulating working fluid, typically helium, around the power generation circuit until the desired conditions are satisfied. The start-up blower system typically includes a normally open in-line valve, at least one blower connected in parallel with the in-line valve and a normally closed isolation valve connected in series with the blower. Conditioning the power generation circuit will typically include stabilizing the pressure in the circuit at between 10 bar and 50 bar.