发明公开
- 专利标题: INTEGRATED STEEL PLANT WITH PRODUCTION OF HOT OR COLD DRI
- 专利标题(中): 随着生产过热或过冷的直接还原铁综合钢铁厂
-
申请号: EP10727502.6申请日: 2010-05-08
-
公开(公告)号: EP2427580A1公开(公告)日: 2012-03-14
- 发明人: BECERRA-NOVOA, Jorge, Octavio , LOPEZ-GOMEZ, Ronald, Victor Manuel , MARTINIS, Alessandro , TAVANO, Andrea
- 申请人: Hyl Technolohies, S.a. De C.v. , Danieli & C. Officine Meccaniche SpA
- 申请人地址: Av Eugenio Clariond Garza 101 Colonia Cuauhtemoc San Nicolás de las Garza Nuevo León 66452 MX
- 专利权人: Hyl Technolohies, S.a. De C.v.,Danieli & C. Officine Meccaniche SpA
- 当前专利权人: Hyl Technolohies, S.a. De C.v.,Danieli & C. Officine Meccaniche SpA
- 当前专利权人地址: Av Eugenio Clariond Garza 101 Colonia Cuauhtemoc San Nicolás de las Garza Nuevo León 66452 MX
- 代理机构: HOFFMANN EITLE
- 优先权: US176769P 20090508
- 国际公布: WO2010128402 20101111
- 主分类号: C21B13/00
- IPC分类号: C21B13/00 ; C21B13/02 ; C21B13/14
摘要:
An integrated steelmaking plant for merging continuous operation of a reduction reactor producing hot DRI with the batch operation of a DRI melting furnace(s). The reactor produces hot DRI for a DRI melting furnace or cold DRI continuously even when the DRI production exceeds the DRI consumption rate of the furnace or suffers long-term operational delays. The reduction reactor has a DRI cooling zone therein which is selectively operable for cooling DRI when the hot DRI produced in the reactor can't all be consumed by the DRI melting furnace and when the capacity of the DRI bin feeding the melting furnace is insufficient to accumulate additional hot DRI. No separate DRI cooling vessel plus its gas compressor and gas cooling-cleaning system is needed, thus decreasing capital and operational costs. This also permits a flexible and modular construction and operation of a steelmaking plant with high or low pressure reduction reactors.
公开/授权文献
- EP2427580B1 INTEGRATED STEEL PLANT WITH PRODUCTION OF HOT OR COLD DRI 公开/授权日:2018-07-11
信息查询