发明公开
EP2591129A1 PROCÉDÉ D'ORDONNANCEMENT DE FONCTIONNEMENT DE DISPOSITIFS DE DISTRIBUTION D'ÉNERGIE, ET INSTALLATION METTANT EN OEUVRE CE PROCÉDÉ 审中-公开
程序进行规划配电设备并且在系统的操作实施该方法

  • 专利标题: PROCÉDÉ D'ORDONNANCEMENT DE FONCTIONNEMENT DE DISPOSITIFS DE DISTRIBUTION D'ÉNERGIE, ET INSTALLATION METTANT EN OEUVRE CE PROCÉDÉ
  • 专利标题(英): Method for scheduling the operation of energy distribution devices, and installation implementing same
  • 专利标题(中): 程序进行规划配电设备并且在系统的操作实施该方法
  • 申请号: EP11716304.8
    申请日: 2011-03-03
  • 公开(公告)号: EP2591129A1
    公开(公告)日: 2013-05-15
  • 发明人: CHERIF IDRISSI EL GANOUNI, OussamaVALLET, Guy
  • 申请人: Fives Stein
  • 申请人地址: 108-112 Avenue de la Liberté 94700 Maisons Alfort FR
  • 专利权人: Fives Stein
  • 当前专利权人: Fives Stein
  • 当前专利权人地址: 108-112 Avenue de la Liberté 94700 Maisons Alfort FR
  • 代理机构: Michardière, Bernard
  • 优先权: FR1055596 20100709
  • 国际公布: WO2012004686 20120112
  • 主分类号: C21D11/00
  • IPC分类号: C21D11/00 F27B9/40 F27D19/00 F27B9/36
PROCÉDÉ D'ORDONNANCEMENT DE FONCTIONNEMENT DE DISPOSITIFS DE DISTRIBUTION D'ÉNERGIE, ET INSTALLATION METTANT EN OEUVRE CE PROCÉDÉ
摘要:
The invention relates to a method for optimizing the supply of energy, over a time interval / of duration D, to an installation equipped with N energy distribution devices operating in all-or-nothing mode and by duration modulation, an operation duration Ai being allocated to each of the N energy distribution devices over the time interval / by a command/control system of the installation. According to the method: a schedule is defined over the time interval / by means of the time division of the set of operating sequences of the N energy distribution devices (B1,B2...BN), and the schedule is calculated before the start of the time interval / by taking account of the desired operation durations Ai of each energy distribution device and, for the distribution device of order number 1, by searching for the optimal position(s) over the time interval of the operating sequence(s) of this distribution device which make it possible to minimize a function U representative of the fluctuations of the energy throughput over the time interval, the sequences of the other devices retaining the positions of the initial schedule, so as to obtain a resulting optimal schedule; and the above is repeated on the basis of the optimal schedule, using successively the distribution devices of higher order number up to the distribution device of order number N, and that which minimizes function U is adopted.
信息查询
0/0