发明公开
- 专利标题: VERFAHREN ZUM ÄNDERN DER AKTIVEN WINDUNGSZAHL EINER REGELWICKLUNG IN EINER ELEKTRISCHEN ANLAGE UND ELEKTRISCHE ANLAGE MIT EINER REGELWICKLUNG
- 专利标题(英): EP3262664A1 - Method for changing the active number of turns of a control winding in an electric system, and electric system comprising a control winding
- 专利标题(中): 改变规则发展的电力系统和电力系统规则发展的有效绕组数量的方法
-
申请号: EP16704640.8申请日: 2016-02-16
-
公开(公告)号: EP3262664A1公开(公告)日: 2018-01-03
- 发明人: SAVELIEV, Anatoli , STERZ, Oliver
- 申请人: Maschinenfabrik Reinhausen GmbH
- 申请人地址: Falkensteinstrasse 8 93059 Regensburg DE
- 专利权人: Maschinenfabrik Reinhausen GmbH
- 当前专利权人: Maschinenfabrik Reinhausen GmbH
- 当前专利权人地址: Falkensteinstrasse 8 93059 Regensburg DE
- 优先权: DE102015102727 20150225
- 国际公布: WO2016135003 20160901
- 主分类号: H01F29/04
- IPC分类号: H01F29/04
摘要:
The invention relates to a method for changing the active number of turns of a control winding (12) in an electric system (10). The control winding is coupled to an AC voltage network for a specified period duration T, is designed for a specified nominal current strength IN, and comprises a first and a second tap (121, 122). The control winding is switched from a first continuous current state, in which a load current flows from the first tap to a load discharge line (15) via a first main path and the second tap is separated from the load discharge line, to a second continuous current state, in which the load current flows from the second tap to the load discharge line via a second main path and the first tap is separated from the load discharge line, according to a specified switch sequence plan. The switch sequence plan specifies that starting from the first continuous current state, the first tap is connected or remains connected to the load discharge line via a first transition path, and the first main path is separated in a switch step a; in a switch step b, the second tap is connected to the load discharge line via a second transition path such that a circuit current iK flows through the transition paths on the basis of the stage voltage between the taps; in a switch step c, the first tap is separated from the load discharge line; and in a switch step d, the second tap is connected to the load discharge line via the second main path; wherein at at least one specified test time tT between switch steps a and c, a test is carried out to determine whether the first main path is separated; a current strength IL of the load current is ascertained; and the test time tT depends on the load current strength IL.
公开/授权文献
信息查询