- 专利标题: METHOD AND SYSTEM FOR WELL CONSTRUCTION MANAGEMENT
-
申请号: EP19204448.5申请日: 2013-12-20
-
公开(公告)号: EP3690184A2公开(公告)日: 2020-08-05
- 发明人: HILDEBRAND, Ginger , COFFMAN, Chunling Gu , ISANGULOV, Rustam
- 申请人: Services Pétroliers Schlumberger , Schlumberger Holdings Limited , Schlumberger Technology B.V.
- 申请人地址: 42, rue Saint Dominique 75007 Paris FR
- 专利权人: Services Pétroliers Schlumberger,Schlumberger Holdings Limited,Schlumberger Technology B.V.
- 当前专利权人: Services Pétroliers Schlumberger,Schlumberger Holdings Limited,Schlumberger Technology B.V.
- 当前专利权人地址: 42, rue Saint Dominique 75007 Paris FR
- 代理机构: Schlumberger Intellectual Property Department
- 优先权: US201261740219P 20121220
- 主分类号: E21B44/00
- IPC分类号: E21B44/00 ; E21B44/04 ; E21B44/06
摘要:
The present invention resides in a computer-implemented method for wellbore construction management, comprising storing a set of wellbore policies and procedures set by a wellbore operator, the policies defining limits relating to wellbore operating parameters and/or guidance in response to incidents encountered during drilling that fall outside expected operating conditions; generating a set of procedures defining construction of the wellbore according to an initial well plan, the set of procedures including drilling operating parameters to be used at any point along the wellbore to be drilled; calculating a set of well states from the initial well plan and the generated set of procedures, the set of well states comprising predetermined parameters of the wellbore expected to exist at each of a plurality of depths of the wellbore being drilled; receiving from the wellbore at least one drilling operating parameter measured at a particular depth during drilling; determining at least one well state parameter from the measured drilling operating parameter; calculating a difference between the at least one calculated well state parameter and the corresponding predetermined well state parameter for the particular depth of the wellbore, when the difference exceeds a selected threshold, generating a modified well plan and a new set of procedures defining construction of at least part of the wellbore to the modified well plan; determining that the modified well plan and the new set of procedures is compliant with the stored wellbore policies and procedures set by the wellbore operator; and communicating the modified well plan to a plurality of users.
公开/授权文献
- EP3690184A3 METHOD AND SYSTEM FOR WELL CONSTRUCTION MANAGEMENT 公开/授权日:2021-01-20
信息查询