发明公开
- 专利标题: A METHOD FOR BUILDING AN OFFSHORE OIL, GAS OR WIND FARM PLATFORM, AND A LIFTING DEVICE
-
申请号: EP23189493.2申请日: 2023-08-03
-
公开(公告)号: EP4321688A1公开(公告)日: 2024-02-14
- 发明人: VAN KERCHOVE, Petrus
- 申请人: Iv-Groep B.V.
- 申请人地址: NL 3351 LD Papendrecht Noordhoek 37
- 代理机构: Dogio Patents B.V.
- 优先权: NL2032730 20220811
- 主分类号: E02B17/02
- IPC分类号: E02B17/02 ; B63B27/30 ; B63B35/00 ; E02B17/04 ; E02D27/52 ; E02B17/00
摘要:
A method for building an offshore oil, gas or wind farm platform, wherein at a first location a topside for said oil, gas or windmill farm platform is fastened on a ship or barge by means of first grillage, whereby the topside is at first height relative to the waterline; said ship or barge sails to a second location where said topside is unfastened, raised, and fastened on a ship or barge by means of a second grillage, whereby the topside is at second height relative to the waterline, wherein the second height is higher than the first height; said ship or barge sails to a third location where said topside is placed on top of a jacket of said oil, gas or wind farm platform; said second location is provided with a lifting device; wherein said lifting device comprises at least four lifting units; wherein the ship or barge with the topside moves between said lifting units; wherein said topside is placed on support points of the lifting units and the first grillage is unfastened from the ship; wherein said topside is moved in vertical direction to a higher position by means of actuators; the topside is fastened to the ship or barge by means of a second grillage whereby the topside is at said second height relative to the waterline.
信息查询