Method for controlling uplink power in multi-subframe scheduling
Abstract:
Disclosed is a method for controlling an uplink (UL) power in a multi-subframe scheduling system including a user equipment (UE) receiving a multi-subframe UL scheduling instruction or physical downlink control channel (PDCCH) data of a downlink control information (DCI) format 3/3 A of the UE, in a DL subframe where the multi-subframe UL scheduling instruction is transmitted, and the UE determining a transmitting power of the PUSCH of each UL subframe scheduled by the multi-subframe UL scheduling instruction, based on a power controlling command value, and transmitting corresponding PUSCH data based on the calculated transmitting power.
Public/Granted literature
Information query
Patent Agency Ranking
0/0