Invention Grant
- Patent Title: Job scheduling optimization based on ratio of stall to active cycles
-
Application No.: US14800002Application Date: 2015-07-15
-
Publication No.: US10585709B2Publication Date: 2020-03-10
- Inventor: Woong Seo , Yeon-Gon Cho , Soo-Jung Ryu , Seok-Woo Song , John Dongjun Kim , Min-Seok Lee
- Applicant: SAMSUNG ELECTRONICS CO., LTD. , Korea Advanced Institute of Science and Technology
- Applicant Address: KR Gyeonggi-do KR Daejeon-si
- Assignee: Samsung Electronics Co., Ltd.,Korea Advanced Institute of Science and Technology
- Current Assignee: Samsung Electronics Co., Ltd.,Korea Advanced Institute of Science and Technology
- Current Assignee Address: KR Gyeonggi-do KR Daejeon-si
- Agency: Harness, Dickey & Pierce, P.L.C.
- Priority: KR10-2013-0054031 20130513
- Main IPC: G06F9/50
- IPC: G06F9/50 ; G06F9/46 ; G06F9/48

Abstract:
An apparatus and a job scheduling method are provided. For example, the apparatus is a multi-core processing apparatus. The apparatus and method minimize performance degradation of a core caused by sharing resources by dynamically managing a maximum number of jobs assigned to each core of the apparatus. The apparatus includes at least one core including an active cycle counting unit configured to store a number of active cycles and a stall cycle counting unit configured to store a number of stall cycles and a job scheduler configured to assign at least one job to each of the at least one core, based on the number of active cycles and the number of stall cycles. When the ratio of the number of stall cycles to a number of active cycles for a core is too great, the job scheduler assigns fewer jobs to that core to improve performance.
Public/Granted literature
- US20150331719A1 APPARATUS AND JOB SCHEDULING METHOD THEREOF Public/Granted day:2015-11-19
Information query