Invention Grant
- Patent Title: Building energy storage system with peak load contribution and stochastic cost optimization
-
Application No.: US16457302Application Date: 2019-06-28
-
Publication No.: US11061424B2Publication Date: 2021-07-13
- Inventor: Mohammad N. Elbsat , Michael J. Wenzel
- Applicant: Johnson Controls Technology Company
- Applicant Address: US MI Auburn Hills
- Assignee: Johnson Controls Technology Company
- Current Assignee: Johnson Controls Technology Company
- Current Assignee Address: US MI Auburn Hills
- Agency: Foley & Lardner LLP
- Main IPC: G05F1/66
- IPC: G05F1/66 ; G05B15/02 ; H02J3/32 ; G05B13/02 ; H02J13/00 ; G06Q10/04 ; H02J7/00 ; G06Q50/06 ; H02J3/00

Abstract:
A central plant includes storage devices configured to store resources purchased from a utility or generated by the central plant and to discharge the one or more resources. The central plant includes a controller configured to obtain a cost function comprising a peak load contribution (PLC) term representing a cost based on an amount of the one or more resources purchased during coincidental peak (CP) subperiods. The controller is configured to modify the cost function by applying a peak subperiods mask to the PLC term, wherein, for each subperiod, the peak subperiods mask modifies a portion of the PLC term corresponding to the subperiod based on a probability that the subperiod will be one of the CP subperiods. The controller is also configured to perform an optimization of the modified cost function.
Public/Granted literature
- US20190324487A1 BUILDING ENERGY STORAGE SYSTEM WITH PEAK LOAD CONTRIBUTION AND STOCHASTIC COST OPTIMIZATION Public/Granted day:2019-10-24
Information query
IPC分类: