Work management device, work management method, and program storage medium
摘要:
Provided is a work management device for arranging a worker in consideration of a change of work efficiency. In a work management device 10, an index acquisition unit 11 acquires, for each work section, a work evaluation index calculated based on work history performed by a worker. A duration time acquisition unit 12 acquires a duration time for which a work status of the worker is the work evaluation index. A cost acquisition unit 13 acquires a cost incurred when the worker moves between the work sections. A determination unit 14 acquires an estimated work amount performed by the worker until the duration time is elapsed. The determination unit 14 determines, based on the estimated work amount and cost, arrangement of the workers in the plurality of work sections in such a way as to increase work efficiency in a whole of a work range.
信息查询
0/0