Dual ballast cribber
摘要:
A dual ballast cribber for on-rail operation for preventing and removing cemented ballast with minimal site preparation can include a central frame, a plurality of wheels, a first pivot arm, a second pivot arm, a first cribber bucket, a second cribber bucket, a first clamp, a second clamp, and a hydraulic system. The dual ballast cribber may perform a digging cycle in 2 minutes or less. Preferably the digging cycle is performed in 45 seconds or less.
公开/授权文献
信息查询
0/0