- 专利标题: Combined rock-breaking TBM tunneling method in complex strata for realizing three-way force detection
-
申请号: US16919058申请日: 2020-07-01
-
公开(公告)号: US11486249B2公开(公告)日: 2022-11-01
- 发明人: Hui Zhou , Jingjing Lu , Futong Xu , Chuanqing Zhang , Dawei Hu , Yang Gao , Fanjie Yang , Yong Zhu , Mingming Hu
- 申请人: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- 申请人地址: CN Hubei
- 专利权人: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- 当前专利权人: Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
- 当前专利权人地址: CN Hubei
- 代理机构: Syncoda LLC
- 代理商 Feng Ma
- 优先权: CN201910587760.X 20190702
- 主分类号: E21D9/00
- IPC分类号: E21D9/00 ; E21D9/10 ; E21D9/087 ; E21D9/11
摘要:
Disclosed a combined rock-breaking TBM tunneling method in complex strata for realizing three-way force detection, comprising the steps of preparing a combined mechanical-hydraulic rock-breaking cutter head for TBM construction; starting construction; advancing the combined mechanical-hydraulic rock-breaking cutter head; pushing and pressing against a tunnel face by a mechanical cutter tool; subjecting a three-way force detection cutter to squeezing forces; feeding back three-way force data by a three-way force sensor; processing information by a TBM back-end control processor; obtaining a value of rock-cutter contact angle φ; feeding back parameter information to a TBM cutter head control center by a lithology index center; responding by the TBM cutter head control center, obtaining and adjusting parameters by the mechanical cutter tool equipped with the three-way force sensor; and breaking rock by the combined mechanical-hydraulic rock-breaking cutter head. The method disclosed is energy-saving and efficient, and has high rock-breaking efficiency.
公开/授权文献
信息查询