- Patent Title: Method for constructing dam inside dump of inner-dump strip mine
-
Application No.: US17656423Application Date: 2022-03-25
-
Publication No.: US11674393B2Publication Date: 2023-06-13
- Inventor: Shuzhao Chen , Quansheng Li , Liu Han , Cangyan Xiao
- Applicant: China University of Mining and Technology , State Energy Investment Group Co. LTD , Jiangsu Vocational Institute of Architectural Technology
- Applicant Address: CN Xuzhou
- Assignee: China University of Mining and Technology,State Energy Investment Group Co. LTD,Jiangsu Vocational Institute of Architectural Technology
- Current Assignee: China University of Mining and Technology,State Energy Investment Group Co. LTD,Jiangsu Vocational Institute of Architectural Technology
- Current Assignee Address: CN Xuzhou; CN Beijing; CN Xuzhou
- Agency: Bayramoglu Law Offices LLC
- Priority: CN 2110399093.X 2021.04.14
- Main IPC: E02B7/02
- IPC: E02B7/02 ; E21F16/00

Abstract:
A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.
Public/Granted literature
- US20220333486A1 METHOD FOR CONSTRUCTING DAM INSIDE DUMP OF INNER-DUMP STRIP MINE Public/Granted day:2022-10-20