Operation method for hydrogen production apparatus and control device for hydrogen production apparatus
Abstract:
A hydrogen production supply system that produces hydrogen gas to be supplied to a hydrogen storage tank, the hydrogen production supply system including a control circuit configured to control an operation load ratio of the hydrogen production apparatus to a predetermined operation load ratio, to increase the operation load ratio of the hydrogen production apparatus to a first operation load ratio larger than the predetermined operation load ratio at first timing, and to decrease the operation load ratio of the hydrogen production apparatus to the predetermined operation load ratio from the first load operation ratio at second timing, wherein an increase in the operation load ratio at the first timing takes precedence over a decrease in the operation load ratio at the second timing.
Information query
Patent Agency Ranking
0/0