发明申请
US20100087154A1 Adjustments of IUB Load Measurements 有权
IUB负载测量的调整

Adjustments of IUB Load Measurements
摘要:
A method may include determining whether a discrepancy exists between scheduling headroom computable by a first device and scheduling headroom computable by a second device, determining one or more load measurements that the second device bases its computation of the scheduling headroom if it is determined that the discrepancy exists, modifying the one or more load measurements, and calculating the scheduling headroom based on the modified one or more load measurements.
公开/授权文献
信息查询
0/0