发明申请
- 专利标题: AUTOMATIC THREE-PHASE UNBALANCED LOAD COMPENSATION EXPERIMENTAL DEVICE AND ITS CONTROL METHOD
- 专利标题(中): 自动三相不平衡负载补偿实验装置及其控制方法
-
申请号: US13483997申请日: 2012-05-30
-
公开(公告)号: US20130054204A1公开(公告)日: 2013-02-28
- 发明人: Huaguang Zhang , Qiuye Sun , Zhenwei Liu , Tieyan Zhang , Xiangping Meng , Qingqi Zhao , Jianguo Zhou , Jun Yang , Dazhong Ma , Yan Zhao , Xinrui Liu , Jing Guo
- 申请人: Huaguang Zhang , Qiuye Sun , Zhenwei Liu , Tieyan Zhang , Xiangping Meng , Qingqi Zhao , Jianguo Zhou , Jun Yang , Dazhong Ma , Yan Zhao , Xinrui Liu , Jing Guo
- 申请人地址: CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Changchun City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City
- 专利权人: Huanguang Zhang,Qiuye Sun,Zhenwei Liu,Tieyan Zhang,Xiangping Meng,Qingqi Zhao,NORTHEASTERN UNIVERSITY,Jun Yang,Dazhong Ma,Yan Zhao,Xinrui Liu,Jing Guo,Jianguo Zhou
- 当前专利权人: Huanguang Zhang,Qiuye Sun,Zhenwei Liu,Tieyan Zhang,Xiangping Meng,Qingqi Zhao,NORTHEASTERN UNIVERSITY,Jun Yang,Dazhong Ma,Yan Zhao,Xinrui Liu,Jing Guo,Jianguo Zhou
- 当前专利权人地址: CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Changchun City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City CN Shenyang City
- 优先权: CN201110249895.9 20110826
- 主分类号: G06G7/48
- IPC分类号: G06G7/48 ; G06F7/60
摘要:
Disclosed are an automatic three-phase unbalanced load compensation experimental device and its control method. The experimental device comprises an automatic compensation device, a load simulation part, and detection, display and control parts. The automatic compensation device comprises power capacitors and intelligent grouping compound switches; the detection, display and control part comprises current transformers, molded case circuit breakers, a three-phase digital display ammeter, a three-phase electric power monitoring instrument, a protocol conversion module, 485 buses, Ethernet cables and an upper computer; the load simulation part comprises phase A, B and C loads which are in star connection and are same in component and circuit connection, an analog output module and a relay output module. Power monitoring instrument and digital ammeter are connected to the grid by circuit breaker and current transformer. The automatic compensation device and load simulation part are connected to the grid in parallel.
公开/授权文献
信息查询