METHOD AND APPARATUS FOR VISUALIZING SCHEDULING RESULT IN MULTICORE SYSTEM
摘要:
A method and an apparatus for visualizing a scheduling result in a multicore system. A method for visualizing a scheduling result of a plurality of tasks with respect to a plurality of cores in a multicore system includes extracting scheduling data in a time section to be visualized, determining whether the number of the extracted scheduling data exceeds a preset first threshold value, if the number of the extracted scheduling data exceeds the preset first threshold value, performing reduction of the extracted scheduling data, and visualizing and outputting the reduced scheduling data.
信息查询
0/0