- 专利标题: MANAGEMENT METHOD OF POWER ENGINEERING COST
-
申请号: US15491187申请日: 2017-04-19
-
公开(公告)号: US20170308934A1公开(公告)日: 2017-10-26
- 发明人: Weidong LIU , Min YU , Liang LINAG , Jun TONG , Fuyan LIU , Zhanghua CAI , Jia CHEN , Hui CHEN
- 申请人: Economy Research Institute of State Grid Zhejiang Electric Power , State Grid Corporation of China , Hangzhou Yihe Electric Power Technology Information Co., LTD.
- 优先权: CN201610260249.5 20160422
- 主分类号: G06Q30/02
- IPC分类号: G06Q30/02 ; G06Q40/06 ; G06Q50/06
摘要:
The present invention discloses a management method of power engineering cost, including: 1) collect and collate the historical power engineering data, and establish engineering sample database; 2) Explore the factors influencing power engineering cost and construct the cost factor associated topology; 3) identify the price transmission path; 4) Establish the power engineering cost change trend model based on the factor distribution on the price transmission path, and conduct training on the model combined with the historical data, to solve the set of cost change trend of the equipments and materials required in the current stage of engineering. By considering the effect of market price fluctuation on the price transmission of required equipments and materials, this invention can propose appropriate management control program for the next stage of engineering costs more clearly, further shrink the deviation of cost, reduce the investment risk of power engineering and improve the dynamic control system of power engineering.
信息查询