REDISTRIBUTING UPDATE RESOURCES DURING UPDATE CAMPAIGNS
Abstract:
Disclosed are various embodiments for the controlling the amount of active updates that can occur during a given time on devices that are associated with tenants (e.g., organizations) and subtenants (e.g., sub-organizations) in a multi-tenant environment. In particular, each tenant and subtenant is assigned throttle corresponding to different update parameters (e.g., an amount of devices executing an active update, an amount of data to be downloaded during a campaign, a time for completing the update campaign, etc.). When an update campaign is established, the update campaign can define the different devices that are to be updated. In some situations, the number of active updates required may exceed the allotted resources for a given subtenant. When a subtenant requires additional resources than what is assigned to complete the update, the subtenant can borrow resources defined by the update parameters from a subtenant peer that has a surplus.
Public/Granted literature
Information query
Patent Agency Ranking
0/0