Invention Application
- Patent Title: PERIDYNAMICS METHOD AND SYSTEM FOR TUNNEL ROCK MASS FAILURE WATER INRUSH CATASTROPHE SIMULATION
-
Application No.: US17630422Application Date: 2020-10-22
-
Publication No.: US20220284152A1Publication Date: 2022-09-08
- Inventor: Shucai LI , Liping LI , Zongqing ZHOU , Chenglu GAO , Shaoshuai SHI , Shuai CHENG , Zhuohui LI , Daosheng ZHANG , Wenfeng TU , Meixia WANG
- Applicant: SHANDONG UNIVERSITY
- Applicant Address: CN Jinan, Shandong
- Assignee: SHANDONG UNIVERSITY
- Current Assignee: SHANDONG UNIVERSITY
- Current Assignee Address: CN Jinan, Shandong
- Priority: CN202010115622.4 20200225
- International Application: PCT/CN2020/122920 WO 20201022
- Main IPC: G06F30/20
- IPC: G06F30/20

Abstract:
A peridynamics method and system for tunnel rock mass failure water inrush catastrophe simulation. A calculation model is discretized into material points, and a virtual boundary layers is set on an outer side of a boundary of the calculation model as an object to which boundary conditions are applied; a size of a horizon of the material points is selected to form a neighborhood matrix; a crustal stress is made equivalent to a stress boundary condition of the calculation model, a karst cave water pressure is made equivalent to a normal pressure, and a displacement constraint and tunnel support are converted into a displacement boundary condition; a speed and a displacement of the material point are solved, and local damage situations are recorded; and a tunnel construction process is simulated by material point dormancy after initial balance calculation is stable.
Information query