IMPLEMENTING POWER DELIVERY TRANSACTION FOR POTENTIAL ELECTRICAL OUTPUT OF INTEGRATED RENEWABLE ENERGY SOURCE AND ENERGY STORAGE SYSTEM FACILITY
Abstract:
A method for implementing power delivery of an integrated renewable energy source and energy storage system (RES-ESS) facility includes a renewable energy source (RES) and an energy storage system (ESS). The method comprises obtaining a first control rule configured to be used to control power distribution in the RES-ESS facility for a time slot, wherein the power distribution includes directing power from a renewable energy source (RES) to an electric grid and to an energy storage system (ESS) and power from the ESS to the electric grid; receiving a second control rule configured to be used to control the power distribution in the RES-ESS facility, wherein the second control rule was used to control the power distribution in the RES-ESS facility for the time slot; determining a difference in performance of the RES-ESS facility; and transmitting a record comprising an identification of the difference in performance.
Information query
Patent Agency Ranking
0/0