Invention Application
- Patent Title: ULTRA-LOW EMISSION ETHYLENE PLANT
-
Application No.: US17917921Application Date: 2021-04-09
-
Publication No.: US20230135324A1Publication Date: 2023-05-04
- Inventor: Peter Oud
- Applicant: TECHNIP ENERGIES FRANCE SAS
- Applicant Address: FR Nanterre Cedex
- Assignee: TECHNIP ENERGIES FRANCE SAS
- Current Assignee: TECHNIP ENERGIES FRANCE SAS
- Current Assignee Address: FR Nanterre Cedex
- Priority: WO20169114.4 20200409
- International Application: PCT/EP2021/059324 WO 20210409
- Main IPC: C07C4/04
- IPC: C07C4/04 ; B01J6/00 ; F01K13/00

Abstract:
The invention relates to an ethylene plant, comprising a cracking furnace for converting a hydrocarbon feedstock into a cracked gas stream; a separation section to provide at least an ethylene-enriched product stream, a hydrogen-enriched fuel stream and a methane-enriched fuel stream from the cracked gas stream; a passage way for feeding at least part of the hydrogen-enriched fuel from the separation section to a burner of the cracking furnace and/or a passage way for feeding at least part of the hydrogen-enriched fuel from the separation section to a burner of a waste heat recovery boiler of a combined cycle gas turbine power plant(CCGT); a methane storage configured for storing methane-enriched fuel and a passage way for feeding at least part of the methane-enriched fuel from the separation section to the storage; the CCGT, comprising a gas turbine—comprising a combustor—and a passage way for feeding at least part of the methane-enriched fuel from the storage to the combustor of the gas turbine of the CCGT, which CCGT is configured to generate electric power and/or to generate high pressure steam to drive a steam turbine forming part of a steam generation circuit of the ethylene plant; and an electric power connection for providing part of the power for operating the plant, which is a connection to an electric power system to produce electric power from a renewable source.
Public/Granted literature
- US11926582B2 Ultra-low emission ethylene plant Public/Granted day:2024-03-12
Information query