METHODS FOR SHORTENING WAITING-ON-CEMENT TIME IN A SUBTERRANEAN WELL
Abstract:
Methods for shortening the waiting-on-cement (WOC) time during primary and remedial cementing operations are disclosed. A fluid pill is injected into the wellbore that comprises reactants. The reaction is acclerating hydration and shortening the time necessary for the slurry to set and harden.
Public/Granted literature
Information query
Patent Agency Ranking
0/0