发明公开
- 专利标题: COAL UNCOVERING CONSTRUCTION METHOD FOR BLASTING LARGE CROSS-SECTION GAS TUNNELS
-
申请号: US18224720申请日: 2023-07-21
-
公开(公告)号: US20240035380A1公开(公告)日: 2024-02-01
- 发明人: Wuxian Wang , Su Yan , Liang Kuang , Jinwen Yang , Mingli Huang , Yitao Feng , Wanqiang Zhao , Liujie Jin , Weiming Zhang , Qian Dong , Liang Du
- 申请人: China Railway 16th Bureau Group Co., Ltd , China Railway Eryuan Engineering Group Co., Ltd , Beijing Jiaotong University , China Railway 16th Bureau Group 1st Engineering Co., Ltd , China Railway 16th Bureau Group 4th Engineering Co., Ltd
- 申请人地址: CN Beijing
- 专利权人: China Railway 16th Bureau Group Co., Ltd,China Railway Eryuan Engineering Group Co., Ltd,Beijing Jiaotong University,China Railway 16th Bureau Group 1st Engineering Co., Ltd,China Railway 16th Bureau Group 4th Engineering Co., Ltd
- 当前专利权人: China Railway 16th Bureau Group Co., Ltd,China Railway Eryuan Engineering Group Co., Ltd,Beijing Jiaotong University,China Railway 16th Bureau Group 1st Engineering Co., Ltd,China Railway 16th Bureau Group 4th Engineering Co., Ltd
- 当前专利权人地址: CN Beijing
- 优先权: CN 2210887595.1 2022.07.26
- 主分类号: E21D9/00
- IPC分类号: E21D9/00 ; E21B49/00
摘要:
A coal uncovering construction method for blasting large cross-section gas tunnels includes: analyzing stress distribution characteristics in front of a tunnel boring working face, and then determining a thickness calculation model of a reserved rock wall based on a limit equilibrium theory; establishing a tunnel model, simulating a construction condition and analyzing a construction result, and determining a thickness of the reserved rock wall; and fixing a detonator through a fixed sand ring, fitting the detonator with a construction hole by adjusting an adjustable protective plate, then embedding the detonator into a blast hole, and blasting the detonator for tunnel construction. Furthermore, an extension ring is fixed between the fixed sand ring and the adjustable protective plate.
公开/授权文献
信息查询