UTILIZATION OF A RESOURCE TO PERFORM A TASK BASED ON A PREDICTED CAPACITY OF THE RESOURCE
Abstract:
The technologies described herein are generally directed to allocating a resource to perform a task based on a predicted capacity of the resource. For example, a method described herein can include identifying a selected capacity associated with completion of tasks of a particular task type. Further, the method can include, evaluating a result of work by a worker resource performing a task of the particular task type. The method can further include, based on the result, predicting that the worker resource has the selected capacity and, based on this prediction, assign the worker resource to perform another task of the particular task type.
Information query
Patent Agency Ranking
0/0