发明授权
- 专利标题: Plant maintenance method and apparatus
- 专利标题(中): 植物维护方法和装置
-
申请号: US10409278申请日: 2003-04-09
-
公开(公告)号: US06928391B2公开(公告)日: 2005-08-09
- 发明人: Kazunari Fujiyama , Toshihiro Fujiwara , Kazuhiro Saito , Taiji Hirawawa , Satoshi Nagai , Hitoshi Kichise , Mitsuyoshi Okazaki , Hirotsugu Kodama , Seiichi Asatsu , Masanori Minowa , Takayuki Iwahashi , Shigeru Harada , Mamoru Sudo , Fumiharu Ishii
- 申请人: Kazunari Fujiyama , Toshihiro Fujiwara , Kazuhiro Saito , Taiji Hirawawa , Satoshi Nagai , Hitoshi Kichise , Mitsuyoshi Okazaki , Hirotsugu Kodama , Seiichi Asatsu , Masanori Minowa , Takayuki Iwahashi , Shigeru Harada , Mamoru Sudo , Fumiharu Ishii
- 申请人地址: JP Tokyo
- 专利权人: Kabushiki Kaisha Toshiba
- 当前专利权人: Kabushiki Kaisha Toshiba
- 当前专利权人地址: JP Tokyo
- 代理机构: Foley & Lardner LLP
- 优先权: JP2002-106705 20020409
- 主分类号: G05B23/02
- IPC分类号: G05B23/02 ; G06Q50/00 ; G06Q50/10 ; G06F15/00
摘要:
Data on inspection, diagnosis, repair and operation histories are entered in a plant-maintenance apparatus for equipment that constitute a plant to be maintained. Failure-event tree breakdown is performed on failures to be expected for the equipment. Unreliability is predicted of at least one starting item in the failure-event tree breakdown. Unreliability of each item in the failure-event tree is calculated based on a failure unreliability function. Unreliability and a cost of recovery from each failure event in the failure-event tree are multiplied and results of the multiplication are accumulated in accordance with the tree breakdown to obtain a recovery cost. Preventive maintenance expenses are calculated for preventing failure events. Maintenance timing and technique are decided through comparison between the recovery cost and the preventive maintenance expenses.
公开/授权文献
- US20030191606A1 Plant maintenanace method and apparatus 公开/授权日:2003-10-09