Invention Grant
US08019631B2 System and method for automatically selecting one or more metrics for performing a capacity maturity model integration 失效
用于自动选择一个或多个度量以执行容量成熟度模型集成的系统和方法

System and method for automatically selecting one or more metrics for performing a capacity maturity model integration
Abstract:
A computer implemented method for automatically identifying one or more metrics for performing a CMMI evaluation of an entity, wherein the CMMI evaluation is performed at a particular CMMI level and the method comprises the steps of accessing an electronic database of a plurality of candidate metrics, providing a first list of requirement elements to define a set of specific requirements of the entity, providing a second list of requirement elements to define a set of general requirements of the business field of the entity, searching for a first subset of metrics from the plurality of candidate metrics that match the first list and second list of requirement elements, searching for a second subset of metrics from the first subset of metrics that match with the CMMI level, and outputting the second set of metrics in a user-friendly format suitable for the CMMI evaluation.
Information query
Patent Agency Ranking
0/0