Invention Grant
US08065040B2 On-site power plant control including adaptive response to transient load requirements
有权
现场发电厂控制包括对瞬态负载要求的自适应响应
- Patent Title: On-site power plant control including adaptive response to transient load requirements
- Patent Title (中): 现场发电厂控制包括对瞬态负载要求的自适应响应
-
Application No.: US12093348Application Date: 2005-12-19
-
Publication No.: US08065040B2Publication Date: 2011-11-22
- Inventor: Mithun R. Kamat , Sara E. Atkinson , Aaron W. Morrow , David P. Lavigne , Guang-Yan Zhu
- Applicant: Mithun R. Kamat , Sara E. Atkinson , Aaron W. Morrow , David P. Lavigne , Guang-Yan Zhu
- Applicant Address: US CT Farmington
- Assignee: Carrier Corporation
- Current Assignee: Carrier Corporation
- Current Assignee Address: US CT Farmington
- Agency: Carlson, Gaskey & Olds PC
- International Application: PCT/US2005/046032 WO 20051219
- International Announcement: WO2007/073365 WO 20070628
- Main IPC: G06F19/00
- IPC: G06F19/00

Abstract:
An on-site power plant (24) has a controller (40) that selectively controls operation of prime movers (26, 28, 30). In one example, the controller (40) changes the number of operating prime movers responsive to a transient in a load (22) requirement while continuing to operate at least one of the prime movers. One example includes prioritizing the prime movers (26, 28, 30) for operation based upon the needs of a cogeneration unit (32, 34, 36) associated with the prime movers for providing a temperature control function within a facility. Another example includes controlling operation of the prime movers based upon a capacity for fueling the prime movers.