发明授权
US08156050B2 Project management system and method 有权
项目管理制度和方法

Project management system and method
摘要:
A project management system comprising a first, second, third, fourth and fifth processing sequences embodied in a computer readable medium. The first processing sequence is operable to provide a user interface to display a plurality of alert indicia corresponding to a plurality of alert status of a plurality of project requirements. The second processing sequence is operable to convert an incomplete requirement to a complete requirement upon completion of a task corresponding to the incomplete requirement. The third processing sequence is operable to determine the alert status of the requirements of the plurality of projects based on a time difference between a current date and a target date corresponding to each requirement. The fourth and fifth processing sequences are operable override the alert status based on user selections.
公开/授权文献
信息查询
0/0