Invention Grant
US08347959B2 Method and system for increasing production of a reservoir 有权
增加水库生产的方法和系统

Method and system for increasing production of a reservoir
Abstract:
A method for stimulating production of a first wellbore associated with a reservoir. The method includes determining a textural complexity of a formation in which the reservoir is located, determining an induced fracture complexity of the formation using the textural complexity, determining a first operation to perform within the formation to maintain conductivity of the formation based on the induced fracture complexity and the textural complexity, performing the first operation within the formation, and fracturing the formation to create a first plurality of fractures.
Public/Granted literature
Information query
Patent Agency Ranking
0/0