发明授权
US08429003B2 Methods, technology, and systems for quickly enhancing the operating and financial performance of energy systems at large facilities; interpreting usual and unusual patterns in energy consumption; identifying, quantifying, and monetizing hidden operating and financial waste; and accurately measuring the results of implemented energy management solutions-in the shortest amount of time with minimal cost and effort
有权
快速提高大型设施能源系统经营和财务绩效的方法,技术和制度; 解释通常和不寻常的能源消耗模式; 识别,量化和货币化隐藏的经营和财务浪费; 并以最少的成本和精力在最短的时间内精确地测量实施的能源管理解决方案的结果
- 专利标题: Methods, technology, and systems for quickly enhancing the operating and financial performance of energy systems at large facilities; interpreting usual and unusual patterns in energy consumption; identifying, quantifying, and monetizing hidden operating and financial waste; and accurately measuring the results of implemented energy management solutions-in the shortest amount of time with minimal cost and effort
- 专利标题(中): 快速提高大型设施能源系统经营和财务绩效的方法,技术和制度; 解释通常和不寻常的能源消耗模式; 识别,量化和货币化隐藏的经营和财务浪费; 并以最少的成本和精力在最短的时间内精确地测量实施的能源管理解决方案的结果
-
申请号: US13452824申请日: 2012-04-20
-
公开(公告)号: US08429003B2公开(公告)日: 2013-04-23
- 发明人: Joseph Zaloom
- 申请人: Joseph Zaloom
- 申请人地址: US VA Falls Church
- 专利权人: Efficiency3 Corp.
- 当前专利权人: Efficiency3 Corp.
- 当前专利权人地址: US VA Falls Church
- 代理机构: Nixon & Vanderhye, P.C.
- 主分类号: G06Q10/00
- IPC分类号: G06Q10/00 ; G06Q30/00
摘要:
Certain examples relate to computer implemented methods and systems including at least three modules whose combined functionality provides for interpretation and optimization of usual and unusual patterns in energy consumption; the identification, quantification, and monetization of hidden operating and financial waste and the accurate measurement of the results of implemented energy management solutions. The first, “Expert Module”, provides information that assists with the accurate interpretation of the information provided in the Operations module. The second, “Costs Module”, allows users to modify consumption and price components and derive the resulting operating costs based on the facility's applied or available rate structures. The third, “Operations Module”, charts and evaluates the current operating performance of a facility down to 15-minute intervals in comparison to the operating performance of a pre-selected “base year”. Comparisons are synchronized over intervals in a manner that allows users to compare and comment on individual graphs interactively.
信息查询