- 专利标题: Electric power plant, and method for running electric power plant
- 专利标题(中): 电厂,电厂运行方式
-
申请号: US12920505申请日: 2009-01-30
-
公开(公告)号: US08448439B2公开(公告)日: 2013-05-28
- 发明人: Koji Namba , Shigeo Hatamiya , Fumio Takahashi , Koji Nishida , Susumu Nakano , Takanori Shibata
- 申请人: Koji Namba , Shigeo Hatamiya , Fumio Takahashi , Koji Nishida , Susumu Nakano , Takanori Shibata
- 申请人地址: JP Hitach-shi
- 专利权人: Hitachi-GE Nuclear Energy, Ltd.
- 当前专利权人: Hitachi-GE Nuclear Energy, Ltd.
- 当前专利权人地址: JP Hitach-shi
- 代理机构: Crowell & Moring LLP
- 国际申请: PCT/JP2009/000359 WO 20090130
- 国际公布: WO2010/086898 WO 20100805
- 主分类号: F01K3/00
- IPC分类号: F01K3/00 ; F01K13/02 ; F01K13/00 ; F01K17/00 ; F01K7/34
摘要:
An electric power plant supplies steam generated to a high-pressure turbine and a low-pressure turbine. The steam discharged from the low-pressure turbine is condensed with a condenser. Water generated with the condenser is heated with a low-pressure feed water heater and a high-pressure feed water heater. The steam extracted from the high-pressure turbine is supplied to the high-pressure feed water heater. The steam extracted from the low-pressure turbine is compressed with a steam compressor, and the steam whose temperature has been increased is then supplied to the high-pressure feed water heater. The feed water is heated in the high-pressure feed water heater by the steam extracted from the high-pressure turbine and the steam compressed with the steam compressor. Because the feed water is heated by the extracted steam and the compressed steam in the high-pressure feed water heater, the amount of power consumed by the steam compressor can be reduced.
公开/授权文献
信息查询