Invention Grant
- Patent Title: Method and device for producing a three-layer cord
- Patent Title (中): 用于生产三层帘线的方法和装置
-
Application No.: US13260977Application Date: 2010-03-29
-
Publication No.: US08720176B2Publication Date: 2014-05-13
- Inventor: Thibaud Pottier , Jacques Gauthier , Jérémy Toussain
- Applicant: Thibaud Pottier , Jacques Gauthier , Jérémy Toussain
- Applicant Address: CH Granges-Paccot FR Clermont-Ferrand
- Assignee: Michelin Recherche et Technique S.A.,Compagnie Generale des Etablissements Michelin
- Current Assignee: Michelin Recherche et Technique S.A.,Compagnie Generale des Etablissements Michelin
- Current Assignee Address: CH Granges-Paccot FR Clermont-Ferrand
- Agent Cozen O'Connor
- Priority: FR0952020 20090331
- International Application: PCT/EP2010/054063 WO 20100329
- International Announcement: WO2010/112445 WO 20101007
- Main IPC: D07B1/00
- IPC: D07B1/00

Abstract:
Method of manufacturing a metal cord with three concentric layers (C1, C2, C3), of the type rubberized in situ, i.e. incorporating a composition made of rubber in the uncrosslinked state referred to as “filling rubber”, the said cable comprising a first, internal, layer or core (C1), around which there are wound together in a helix, at a pitch p2, in a second, intermediate, layer (C2), N wires of diameter d2, N varying from 3 to 12, around which second layer there are wound together as a helix at a pitch p3, in a third, outer, layer (C3), P wires of diameter d3, P varying from 8 to 20, the said method comprising the following steps: a first sheathing step in which the core (C1) is sheathed with the filling rubber; a first assembling step by twisting the N wires of the second layer (C2) around the core (C1) thus sheathed in order to form, at a point named the “assembling point”, an intermediate cord named “core strand” (C1+C2); downstream of the said assembling point, a second sheathing step in which the core strand (C1+C2) is sheathed with the filling rubber; a second assembling step in which the P wires of the third layer (C3) are twisted around the core strand (C1+C2) thus sheathed; a final twist-balancing step.
Public/Granted literature
- US20120102909A1 Method and Device for Producing a Three-Layer Cord Public/Granted day:2012-05-03
Information query