发明授权
US08857516B2 Methods for completing multi-zone production wells using sliding sleeve valve assembly 有权
使用滑套阀组件完成多区生产井的方法

Methods for completing multi-zone production wells using sliding sleeve valve assembly
摘要:
Systems and methods for fracturing multiple zones in a wellbore. A first port in a first valve assembly can be opened with a shifting tool. A fluid flows through the first port to fracture a first zone, and the first port can be closed with the shifting tool after the first zone has been fractured. A second port can be opened in a second valve assembly with the shifting tool after the first port has been closed, wherein the second valve assembly is positioned below the first valve assembly. The fluid can flow through the second port to fracture a second zone, and the second port can be closed with the shifting tool after the second zone has been fractured.
信息查询
0/0