Invention Grant
- Patent Title: System and method for loading a combined cycle power plant
- Patent Title (中): 装载联合循环发电厂的系统和方法
-
Application No.: US13798044Application Date: 2013-03-12
-
Publication No.: US09523313B2Publication Date: 2016-12-20
- Inventor: Kihyung Kim , Seyfettin Can Gulen , Brett Matthew Thompson
- Applicant: General Electric Company
- Applicant Address: US NY Schenectady
- Assignee: General Electric Company
- Current Assignee: General Electric Company
- Current Assignee Address: US NY Schenectady
- Agency: Fletcher Yoder, P.C.
- Main IPC: F02C1/00
- IPC: F02C1/00 ; F02C7/057 ; F02C6/18 ; F02C9/20

Abstract:
A system including a gas turbine system configured to transition between a first load state and a second load state, wherein the gas turbine system comprises an airflow control module configured to adjust an airflow through the gas turbine system between a minimum airflow condition and a maximum airflow condition, and a controller configured to control the gas turbine system to operate with a load path between a first load path corresponding to the minimum airflow condition and a second load path corresponding to the maximum airflow condition, wherein the controller is configured to control the gas turbine system to transition between the first load state and the second load state using the load path between the first and second load paths.
Public/Granted literature
- US20140260284A1 System and Method for Loading a Combined Cycle Power Plant Public/Granted day:2014-09-18
Information query