Marine pipelaying and method for abandonment of a pipeline
Abstract:
A method is provided for installing a pipeline on the seabed from a marine pipelaying vessel, including initiation, pipelaying, and abandonment of the pipeline. An embodiment of the abandonment of the pipeline includes halting pipelaying and engaging a hang-off clamp with the pipeline at a position below one or more tensioners, transferring the weight onto the hang-off clamp and holding the seagoing pipeline in the firing line, severing the pipeline, connecting the initiation cable to the lower end of the pipeline held by the one or more tensioners, transferring pipeline tension onto the initiation cable, releasing the one or more tensioners, so that a section of the pipeline is held in the firing line between the pipeline diverter and the initiation cable, vacating the firing line by at least displacing both the pipeline diverter and the initiation cable sheave and thereby displacing said section of the pipeline from the firing line, arranging the A&R cable in the firing line, connecting the A&R cable to the upper end of the seagoing pipeline held in the firing line, releasing the hang-off clamp, and operating the A&R winch and thereby lowering the pipeline onto the seabed.
Public/Granted literature
Information query
Patent Agency Ranking
0/0