Invention Application
- Patent Title: HEAT MANAGEMENT IN A CLINKER BURNING DEPARTMENT IN A PLANT FOR MANUFACTURE OF CEMENT CLINKER
-
Application No.: PCT/EP2022/074951Application Date: 2022-09-08
-
Publication No.: WO2023041410A1Publication Date: 2023-03-23
- Inventor: RYDENG, Peter Enemark
- Applicant: FLSMIDTH A/S
- Applicant Address: Vigerslev Alle 77
- Assignee: FLSMIDTH A/S
- Current Assignee: FLSMIDTH A/S
- Current Assignee Address: Vigerslev Alle 77
- Priority: DKPA202100883 2021-09-17
- Main IPC: F27B7/20
- IPC: F27B7/20 ; C04B7/43 ; C04B7/44 ; F27D17/00
Abstract:
The invention relates to a system for extraction of hot combustion gas to supply heat for separate use, said hot combustion gas extracted from a preheater(1) of a clinker burning department in a plant for manufacture of cement clinker, said plant comprising a preheater(1), a rotary kiln(3), a clinker cooler(4), said preheater(1) comprising two or more cyclone stages,where the hot combustion gas is extracted from one or more locations between a rotary kiln gas outlet(32) and an exhaust gas outlet stage cyclone(1a) of the preheater(1), said plant being connected to a separate use application which is a heat consuming process or plant which can receive a heat input as hot combustion gas from said clinker burning department, wherein the extraction of hot combustion gas utilizes a heat transformation effect of the preheater(1).
Information query