Suspension bridge
    101.
    发明公开
    Suspension bridge 失效
    Hängebrücke。

    公开(公告)号:EP0195861A1

    公开(公告)日:1986-10-01

    申请号:EP85301988.3

    申请日:1985-03-22

    IPC分类号: E01D11/00 E01D17/00 E04B1/34

    CPC分类号: E04B1/34 E01D11/02 E01D18/00

    摘要: This invention relates to suspension bridges. A modular component for a suspension bridge structure comprises in combination an elongated member (10) having one end (11) thereof supported upon a base (20) and the other free end (12) thereof disposed upwardly of the base. An elongated boom-like member (30) is disposed to be supported upon one end (31) of the base angularly relative to the other elongated member whereby the free ends (12, 32) of the members respectively are spaced one from another in a first vertical plane. A first tie means (40) extends between the free ends of the members (10 and 12) and a second tie means (50) extends between the free end of the elongated member (10) and a first anchor point (51) spaced from the base (20) whereby an acute angle is formed between the second tie means and the elongated member (10).
    A further mirror image modular component is formed based on a second base so that the first and second bases are positioned in selected spaced relation one to another. An elongated traffic deck structure (60) is disposed below and longitudinally of the elongated boom-like members (30) and supported thereform via respective tie means (71).
    A novel method of constructing a bridge is also disclosed.

    摘要翻译: 本发明涉及吊桥。 用于悬挂桥结构的模块化部件包括组合的细长构件(10),其具有一个端部(11),其支撑在基座(20)上,而另一个自由端(12)设置在基座的上方。 细长的动臂状构件(30)设置成相对于另一个细长构件成角度地支撑在底座的一端(31)上,由此构件的自由端(12,32)分别彼此间隔开 第一垂直平面 第一连接装置(40)在构件(10和12)的自由端之间延伸,并且第二连接装置(50)在细长构件(10)的自由端与第一锚定点(51)之间延伸,第一锚点 所述基座(20)由此在所述第二连接装置和所述细长构件(10)之间形成锐角。 ...基于第二基底形成另一镜像模块化部件,使得第一和第二基座彼此之间以选定的间隔关系定位。 细长的交通甲板结构(60)设置在细长悬臂状构件(30)的下方和纵向,并通过相应的连接装置(71)支撑在其上。 还公开了一种构建桥的新颖方法。

    Kabel für Bauwerke, insbesondere Schrägkabelbrücken und Verfahren zu dessen Herstellung
    102.
    发明公开
    Kabel für Bauwerke, insbesondere Schrägkabelbrücken und Verfahren zu dessen Herstellung 失效
    电缆结构,尤其是斜拉桥,及其制备方法。

    公开(公告)号:EP0173350A2

    公开(公告)日:1986-03-05

    申请号:EP85110987.6

    申请日:1985-08-30

    IPC分类号: E01D11/00

    CPC分类号: E01D19/16

    摘要: Die Erfindung bezieht sich auf ein Kabel (2) für Bauwerke, insbesondere Schrägkabelbrücken, aus mehreren gebündelten Zugelementen (6), die von einem Hüllrohr (7) umgeben sind, wobei der Hohlraum zwischen Zugelementen (6) und Hüllrohr (7) mit einem Injiziermaterial, vorzugsweise Zementmörtel (9) verpresst ist. Um die Herstellungs-, Transport- und Montage-Kosten für ein derartiges Kabel zu verringern, wird gemäss der Erfindung vorgeschlagen, das Hüllrohr (7) direkt am Ort des Bauwerkes aus mindestens einem Stahlblechstreifen (11) mit der Länge des Hüllrohres zu formen, wobei aneinandergrenzende Längskanten der Streifen (11), z.B. mit einer Falznaht (15) verbunden sind. Das in einer Formstation (10) sukzessive hergestellte Hüllrohr wird auf die bereits gespannten Zugelemente (6) geschoben, anschliessend gegenüber Verankerungen (4 und 5) des Kabels (2) abgedichtet und mit dem Zementmörtel (9) verpresst.

    摘要翻译: 一种用于结构,爱尤其悬索桥,电缆具有捆绑张力元件通过一管状护套间隔地包围的复数,张力元件和鞘之间的空间被填充有材料,优选注入砂浆。 为了减少生产,运输和组装寻求电缆的成本,该管状护套在工作现场在一个成形和封接台形成为从至少一张薄板钢带和进展沿着已经张紧的张力元件,然后密封以防止固定扣的 电缆,并且填充有压力下砂浆。

    Long-span bridges
    106.
    发明公开
    Long-span bridges 无效
    推动大跨度。

    公开(公告)号:EP0057052A1

    公开(公告)日:1982-08-04

    申请号:EP82300078.1

    申请日:1982-01-07

    申请人: NMI Limited

    IPC分类号: E01D1/00 E01D11/00

    CPC分类号: E01D11/02

    摘要: A suspension bridge has a first deck 10 supported from a pair of suspension cables 14 and 15 by hangers 12 and 13 and a second deck 11 independently supported from a pair of suspension cables 18 and 19 by hangers 20 and 21. The two parallel decks are separated by a gap whose width is not less than that of either of the decks and is preferably three or more times the width of a deck. The decks are joined at intervals diagonal shear braces so that the two decks behave essentially as a single rigid body in regard to rotation in the plane of Figure 2. This results in very high aerodynamic damping of both torsional and bending modes of oscillation.

    Vorgespanntes Stahlbetonseil und Verfahren zur Anwendung von vorgespannten Stahlbetonseilen bei der Herstellung einer Hängebrücke
    107.
    发明公开
    Vorgespanntes Stahlbetonseil und Verfahren zur Anwendung von vorgespannten Stahlbetonseilen bei der Herstellung einer Hängebrücke 无效
    预应力混凝土钢绳索,并在吊桥的制备中使用预应力钢筋混凝土部件的方法。

    公开(公告)号:EP0004345A1

    公开(公告)日:1979-10-03

    申请号:EP79100789.1

    申请日:1979-03-15

    IPC分类号: E04C5/08 E01D11/00 E01D21/04

    CPC分类号: E01D19/16 E04C5/08

    摘要: Zur Herstellung eines vorgespannten Stahlbetonseils werden in einem Außenmantelrohr (10) Hüllrohre (12) für die Aufnahme der Spannstähle (16) angeordnet und der Innenraum des Außenmantelrohres (10) ausbetoniert. Nach dem Spannen der Spannstähle (16) werden die Hüllrohre (12) durch Injektion ausbetoniert. Bei einem solchen Stahlbetonseil dient das Außenmantelrohr (10) als verlorene Schalung und als Schutz für das Stahlbetonseil. Ein derartiges Stahlbetonseil findet für Tragseile und Hängestäbe einer Hängebrücke Verwendung.

    摘要翻译: 1.后张钢筋混凝土电缆,钢筋由......组成(16)的导管(12),其被嵌入在混凝土,并且其特征在于在没有混凝土是由钢套管覆盖(10),该施工期间用作丢失形式 ,并没有导管(12),通过钢隔板(11)上运行由钢管可以通过拉伸或压缩强调的。

    ANCHORING APPARATUS THAT ADAPTS TO LONGITUDINAL MOVEMENT OF STRUCTURE AND INSTALLATION METHOD

    公开(公告)号:EP4006231A1

    公开(公告)日:2022-06-01

    申请号:EP20847198.7

    申请日:2020-05-19

    IPC分类号: E01D11/04 E01D19/16

    摘要: An anchoring apparatus that adapts to the longitudinal movement of a structure and installation method therefor. The anchoring apparatus that adapts to the longitudinal movement of a structure comprises a flared steel casing tube (1) and a cable guide pipe (8); a cable (6) is threaded through the inside of the cable guide pipe (8), the cable (6) being fixed to an end of the cable guide pipe (8) by means of a cable seal tube (7); the flared steel casing tube (1) is located within the cable guide pipe (8); the inner diameter of the flared steel casing tube (1) gradually lengthens along the direction leading away from the cable seal tube (7); the outer wall of the flared steel casing tube (1) is fixed to the inner wall of the cable guide pipe (8). The installation method for the anchoring apparatus that adapts to the longitudinal movement of a structure comprises the following steps: machining the flared steel casing tube (1) according to the designed horizontal curve; inserting the flared steel casing tube (1) into the cable guide pipe (8) and fixedly connecting same to the inner wall of the cable guide pipe (8), forming an integral body; threading the cable (6) through the inside of the cable guide pipe (8) and performing tensioning. The anchoring apparatus that adapts to the longitudinal movement of a structure increases the contact area of the outer wall of the cable (6) and the inner wall of the flared steel casing tube (1), preventing part of the cable (6) from being subjected to a concentrated cutting force, improving the safety of the anchoring system.