摘要:
A dock building apparatus comprises a cantilever arm (11) having a first portion configured to be supported on a ground area and a second portion for overhanging a construction area. The cantilever arm (11) is displaceable perpendicularly to the length of the cantilever arm. The apparatus further includes a lifting device (19) movable along the cantilever arm for bringing construction materials including foundation members from the ground area to the second portion of the cantilever arm, and a foundation building tool (15) movable along the cantilever arm for installing the foundation members in the construction area.
摘要:
A method for controlling power transmission between a structure and its base during grouting- in the fastening parts of the structure in the corresponding bases on or in the seabed, and where the method is characterised by comprising: - connecting a bracket to at least one of the fastening parts of the structure; - arranging an elastic material on the bracket; - displacing the fastening part to an overlapping position with the base until the elastic material transmits a least a portion of the weight of the structure to the base; and - filling an opening between the fastening part and the base with a curable mass.
摘要:
A post anchor (1) comprising a shaft (2) to which is fixed at least one stabilising element (4, 14) wherein the anchor post (1) is configured to resist rotational movement.
摘要:
An assembly for forming an elongate construction element underground, in particular a foundation pile, comprises an elongate displacement body (10) and a device for driving the displacement body into the ground in an axial direction. The displacement body is provided at an outer end (13) with at least one displacing member (14) and with an outflow opening (12) for a curing construction liquid. The at least one displacing member herein comprises at least one substantially flat blade which extends in axial direction from the outer end of the displacement body. The blade (14) is provided with at least one recess (21..24) within a periphery (15) which may or may not be imaginary.
摘要:
A pier (10) to be driven into a ground surface includes an auger member (11) having a shaft (12) that is rotated in a first direction to drive the auger member into the ground surface, and a compaction member (16) having a sleeve (17) surrounding a portion of the shaft. The compaction member (16) includes a compaction part (18) attached to and extending laterally outwardly of the sleeve (17). A threaded rod (23) engages the shaft (12) and is rotated to cause the compaction member (16) to move down the shaft (12) and compact the soil around the shaft.
摘要:
The present invention relates to a foundation structure vertically installed on the ground, and comprising: an upper support layer 10 formed on the ground in the vertical direction; and a lower support layer 20 formed so as to extend downward from the upper support layer 10 and such that the width thereof is less than that of the upper support layer 10. The disclosed upper support layer 10 and the lower support layer 20 are structures formed from soil solidified by means of feeding and mixing an earth and soil-solidifying agent therein, and therefore are efficient and prevent overload due to boring equipment.
摘要:
Method for installation of an offshore tower, which comprises: providing a tower mast, piles, anchoring means, a platform with securing means, and buoyancy means with securing means; fastening piles to platform; fastening mast to platform in the use position; providing actuation and/or braking means between piles and platform; providing a platform between lower zone and upper zone; anchoring means to piles and to platform; launching buoyancy means; launching base assembly (platform, mast, piles, anchoring means); securing base assembly to buoyancy means using securing means; transferring transport assembly to tower location; actuating actuation and/or braking means until piles are fixed in the seabed; fastening piles to seabed; actuating actuation and/or braking means until platform is on a level with pile upper zone; mounting wind turbine on mast; removing securing means and withdrawing buoyancy means from platform; and tensioning anchoring means.
摘要:
The present invention relates to a foundation structure vertically installed on the ground, and comprising: an upper support layer 10 formed on the ground in the vertical direction; and a lower support layer 20 formed so as to extend downward from the upper support layer 10 and such that the width thereof is less than that of the upper support layer 10. The disclosed upper support layer 10 and the lower support layer 20 are structures formed from soil solidified by means of feeding and mixing an earth and soil-solidifying agent therein, and therefore are efficient and prevent overload due to boring equipment.
摘要:
A post anchor (1) comprising a shaft (2) to which is fixed at least one stabilising element (4, 14) wherein the anchor post (1) is configured to resist rotational movement.
摘要:
The invention relates to a foundation for buildings having a combination of pole-like support elements (11) and a load distribution layer (12) disposed above said elements and having an integrated three-dimensional honeycomb structure.