-
公开(公告)号:US20210123191A1
公开(公告)日:2021-04-29
申请号:US17051787
申请日:2018-06-11
申请人: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE , CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED , BEIJING TIEKE SHOUGANG TRACK TECHNOLOGY CO. , LTD
发明人: Yangsheng YE , Ruilin YOU , Jia FAN , Weibin LIU , Xianggang DU , Zhenyu TAN , Zhanguo MA , Liangshan XU
摘要: A fiber-reinforced prestressed reinforced concrete sleeper is integrally cast and includes a sleeper body and two rail bearing regions. A rail clamping base is arranged on a surface of the each rail bearing region. The two rail bearing regions are located under rails on both sides of the sleeper and the two rail bearing regions are located above the sleeper body. A reinforcing fiber is mixed into the two rail bearing regions only, and a reinforcing rib is arranged in the sleeper body. The reinforcing fiber is concentrated in a main stress region under the surface of the rail bearing regions. The reinforcing fiber arranged in a region with a large stress is more than the reinforcing fiber arranged in a region with a small stress.
-
公开(公告)号:US20210230809A1
公开(公告)日:2021-07-29
申请号:US17051789
申请日:2018-06-05
申请人: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE , CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED
发明人: Junheng XIAO , Hangwei FANG , Zirui LI , Yanshan LI , Chengliang LI , Haoyong YU , Liangshan XU , Zhen PAN
摘要: A boltless fastener assembly for a heavy haul railway with an axle load of 35-40 tons includes a pre-embedded steel holder, an e-clip, an insulated gauge block and a rubber pad. A clamping leg-heel end of the e-clip is provided with an L-shaped retaining end. The pre-embedded steel holder is improved to adapt to the e-clip, and an opening is formed at a portion of the pre-embedded steel holder close to the clamping leg-heel end of the e-clip, so that the e-clip can be installed normally. During normal installation, the L-shaped retaining end of the e-clip does not contact the pre-embedded steel holder. When the rail undergoes large torsional deformation, the L-shaped retaining end on one side of a rail moves upward to contact an upper edge of the opening of the pre-embedded steel holder or engages with a second heel end.
-
公开(公告)号:US11162227B2
公开(公告)日:2021-11-02
申请号:US17051789
申请日:2018-06-05
申请人: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE , CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED
发明人: Junheng Xiao , Hangwei Fang , Zirui Li , Yanshan Li , Chengliang Li , Haoyong Yu , Liangshan Xu , Zhen Pan
摘要: A boltless fastener assembly for a heavy haul railway with an axle load of 35-40 tons includes a pre-embedded steel holder, an e-clip, an insulated gauge block and a rubber pad. A clamping leg-heel end of the e-clip is provided with an L-shaped retaining end. The pre-embedded steel holder is improved to adapt to the e-clip, and an opening is formed at a portion of the pre-embedded steel holder close to the clamping leg-heel end of the e-clip, so that the e-clip can be installed normally. During normal installation, the L-shaped retaining end of the e-clip does not contact the pre-embedded steel holder. When the rail undergoes large torsional deformation, the L-shaped retaining end on one side of a rail moves upward to contact an upper edge of the opening of the pre-embedded steel holder or engages with a second heel end.
-
公开(公告)号:US11136724B2
公开(公告)日:2021-10-05
申请号:US17051787
申请日:2018-06-11
申请人: CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED RAILWAY ENGINEERING RESEARCH INSTITUTE , CHINA ACADEMY OF RAILWAY SCIENCES CORPORATION LIMITED , BEIJING TIEKE SHOUGANG TRACK TECHNOLOGY CO., LTD
发明人: Yangsheng Ye , Ruilin You , Jia Fan , Weibin Liu , Xianggang Du , Zhenyu Tan , Zhanguo Ma , Liangshan Xu
摘要: A fiber-reinforced prestressed reinforced concrete sleeper is integrally cast and includes a sleeper body and two rail bearing regions. A rail clamping base is arranged on a surface of the each rail bearing region. The two rail bearing regions are located under rails on both sides of the sleeper and the two rail bearing regions are located above the sleeper body. A reinforcing fiber is mixed into the two rail bearing regions only, and a reinforcing rib is arranged in the sleeper body. The reinforcing fiber is concentrated in a main stress region under the surface of the rail bearing regions. The reinforcing fiber arranged in a region with a large stress is more than the reinforcing fiber arranged in a region with a small stress.
-
-
-