Furnace and method using electric resistance and forced convection for heating glass sheets
    1.
    发明申请
    Furnace and method using electric resistance and forced convection for heating glass sheets 审中-公开
    使用电阻和强制对流加热玻璃板的炉子和方法

    公开(公告)号:US20040237591A1

    公开(公告)日:2004-12-02

    申请号:US10447096

    申请日:2003-05-28

    CPC classification number: C03B29/08 C03B35/163 F27B9/06 F27B9/063 F27B9/10

    Abstract: A furnace (12) and a method for heating roll conveyed glass sheets by electric resistance radiant heating and forced convection heating by hot air jets that also entrain hot air within the furnace. A hot air distributing system (86) includes upper and lower arrays (90) of hot air distributors (92) that are constructed to effectively supply the convective heating. The hot air distributors (92) have heat exchangers (96) that heat the pressurized air that provides the hot air jets. The heating can be performed on both uncoated and coated glass sheets and furnace (12) conveys the glass sheets either in an oscillating manner or a continuous one direction manner during the heating.

    Abstract translation: 炉(12)和通过电热辐射加热和热空气射流的强制对流加热来轧制输送的玻璃板的方法,该空气喷嘴还夹带炉内的热空气。 热空气分配系统(86)包括热空气分配器(92)的上部和下部阵列(90),其被构造成有效地供应对流加热。 热空气分配器(92)具有加热提供热空气射流的加压空气的热交换器(96)。 可以在未涂覆的玻璃板和涂覆的玻璃板上进行加热,炉子(12)在加热期间以振荡方式或连续的一个方向输送玻璃板。

    QUENCH STATION AND METHOD FOR QUENCHING FORMED GLASS SHEETS
    2.
    发明申请
    QUENCH STATION AND METHOD FOR QUENCHING FORMED GLASS SHEETS 有权
    捣固形成的玻璃片的哨台和方法

    公开(公告)号:US20020189289A1

    公开(公告)日:2002-12-19

    申请号:US09884843

    申请日:2001-06-19

    CPC classification number: C03B27/0447 C03B27/0417 C03B35/202

    Abstract: A glass sheet quench station (16) includes first and second quench sections (24 and 26) that cooperate with a three position shuttle (28) and a control (30) to transfer glass sheets through the quench station with partial quenching performed at the first quench station and completion of the quenching at the second quench section. This glass sheet quenching method with two stage quenching shortens the cycle time to provide increased production.

    Abstract translation: 玻璃板淬火站(16)包括与三个位置梭子(28)配合的第一和第二骤冷部分(24和26)和控制器(30),以通过淬火站将玻璃板转移到第一和第二骤冷部分 骤冷站,并在第二骤冷段完成淬火。 这种具有两段淬火的玻璃板淬火方法缩短了循环时间,提供了增加的生产。

Patent Agency Ranking