-
公开(公告)号:US10760391B2
公开(公告)日:2020-09-01
申请号:US15776139
申请日:2016-11-16
申请人: NEXEN ENERGY ULC , Roberto Aguilera , Alfonso Fragoso , Yi Wang , Guicheng Jing
发明人: Roberto Aguilera , Alfonso Fragoso , Yi Wang , Guicheng Jing , Karthikeyan Selvan , Thomas Harding , Faisal Qureshi
摘要: There is provided a method of producing hydrocarbon material. A first hydrocarbon material is produced from the formation, the first hydrocarbon material including a gaseous hydrocarbon material originally in place in the formation. At least a portion of the produced gaseous hydrocarbon material is injected into the formation to increase the formation pressure. A second hydrocarbon material is produced from the formation.
-
公开(公告)号:US11008842B2
公开(公告)日:2021-05-18
申请号:US15768678
申请日:2016-10-14
摘要: A method for capturing hydrocarbons from a formation is provided. After a first hydraulic fracturing of a formation to produce a first conditioned formation, and while hydrocarbons are being produced from the first conditioned formation, a predetermined wellbore characteristic is monitored for. The predetermined wellbore characteristic is based on at least a pressure within the first conditioned formation. After detecting the predetermined wellbore characteristic, a second hydraulic fracturing of the formation is effected to produce a second conditioned formation.
-