-
1.
公开(公告)号:US20230272696A1
公开(公告)日:2023-08-31
申请号:US18114300
申请日:2023-02-27
Inventor: Bin GONG , Yujing JIANG
CPC classification number: E21B41/0099 , E21B7/046 , E21B33/13 , E21B49/00 , E21B33/12
Abstract: Disclosed is a method for deep-sea extraction of natural gas hydrates with reservoir top control and sand prevention, belonging to the technical field of natural gas hydrates mining. A grouting layer is constructed between a natural gas hydrates reservoir layer and an upper overburden layer by adopting a multi-branch horizontal well process, a vertical shaft is drilled further into the natural gas hydrates reservoir layer after the grouting layer is stabilized, and a mining device and a bottom plugging device are installed in the vertical shaft according to a thickness of the reservoir.