公开(公告)号:US20220282619A1
公开(公告)日:2022-09-08
申请号:US17752842
申请日:2022-05-24
Applicant: Taiyuan University of Technology
Inventor: Guorui FENG , Yijiang FAN , Pengfei WANG , Chenliang HAO , Xiaoze WEN , Jun GUO , Jinwen BAI , Tingye QI , Jianan LIU , Linjun ZHU , Changquan WU
Abstract: A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining. A return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level. The return air gateroad of the stoping face is arranged along a roof of a coal seam. The inlet air gateroad of the heading face is arranged along a floor of the coal seam. There is a height difference between the return air gateroad and the inlet air gateroad in a vertical direction. During the construction process, the inlet air gateroad is excavated at a delay distance of 180-200 meters from the return air gateroad. The drilling and grouting are performed while excavating the roadway, where grouting holes are arranged in a single row. A device for implementing the method is also provided.