-
公开(公告)号:US20230126144A1
公开(公告)日:2023-04-27
申请号:US17914887
申请日:2021-03-26
Applicant: ENEOS CORPORATION
Inventor: Tadashi SEIKE , Hideshi IKI , Seiji MAEDA
IPC: G06Q10/0832 , C01B3/26
Abstract: Provided is an operation management system configured to manage delivery of a raw material from a raw material production base where the raw material including a hydride is produced to a plurality of dehydrogenation bases where the raw material is subjected to a dehydrogenation reaction to obtain a hydrogen-containing gas. The operation management system includes: an information acquisition unit configured to acquire first information on a dehydrogenation status in the plurality of dehydrogenation bases; and a delivery plan creation unit configured to create a delivery plan for delivering the raw material to the plurality of dehydrogenation bases on the basis of the first information.
-
12.
公开(公告)号:US20240105970A1
公开(公告)日:2024-03-28
申请号:US18527824
申请日:2023-12-04
Applicant: ENEOS CORPORATION
Inventor: Akihiko FUKUNAGA , Toshio TEZUKA , Tadashi SEIKE , Hirofumi NISHIO , Daisaku TATEISHI
IPC: H01M8/04089 , B60S5/02 , C01B3/32 , H01M8/04082 , H01M8/0606
CPC classification number: H01M8/04089 , B60S5/02 , C01B3/32 , H01M8/04201 , H01M8/0606 , B60L50/70 , H01M2250/20
Abstract: A hydrogen production supply system that produces hydrogen gas to be supplied to a hydrogen storage tank, the hydrogen production supply system including a control circuit configured to control an operation load ratio of the hydrogen production apparatus to a predetermined operation load ratio, to increase the operation load ratio of the hydrogen production apparatus to a first operation load ratio larger than the predetermined operation load ratio at first timing, and to decrease the operation load ratio of the hydrogen production apparatus to the predetermined operation load ratio from the first load operation ratio at second timing, wherein an increase in the operation load ratio at the first timing takes precedence over a decrease in the operation load ratio at the second timing.
-
公开(公告)号:US20230416083A1
公开(公告)日:2023-12-28
申请号:US18039396
申请日:2021-11-12
Applicant: ENEOS Corporation
Inventor: Tadashi SEIKE , Hideshi IKI , Seiji MAEDA
CPC classification number: C01B3/26 , C01B3/501 , C01B3/506 , B01J19/0006 , C01B2203/0277 , C01B2203/041 , C01B2203/046 , C01B2203/0883 , C01B2203/1252 , C01B2203/1647
Abstract: A hydrogen supply system supplying hydrogen, the hydrogen supply system including: a dehydrogenation reaction unit acquiring a hydrogen-containing gas by performing a dehydrogenation reaction of a raw material containing a hydride; and a control unit controlling the hydrogen supply system, in which in a case in which generation of the hydrogen-containing gas in the dehydrogenation reaction unit stops, the control unit causes the hydrogen supply unit to supply hydrogen to the dehydrogenation reaction unit, and the hydrogen supply unit supplies at least one of the hydrogen-containing gas between the dehydrogenation reaction unit and a vapor-liquid separating unit separating a dehydrogenation product from the hydrogen-containing gas and the hydrogen-containing gas separated by the vapor-liquid separating unit separating a dehydrogenation product from the hydrogen-containing gas to the dehydrogenation reaction unit.
-
公开(公告)号:US20230111727A1
公开(公告)日:2023-04-13
申请号:US17914939
申请日:2021-03-26
Applicant: ENEOS CORPORATION
Inventor: Tadashi SEIKE , Hideshi IKI , Seiji MAEDA
IPC: C01B3/06
Abstract: Provided is a hydrogen supply system that supplies hydrogen. The hydrogen supply system includes: a dehydrogenation reaction unit that subjects a raw material including a hydride to a dehydrogenation reaction to obtain a hydrogen-containing gas; a circulation system that circulates a reaction inactive fluid to the dehydrogenation reaction unit; and a control unit that controls the hydrogen supply system. The control unit circulates the reaction inactive fluid with the circulation system in a case where production of the hydrogen-containing gas in the dehydrogenation reaction unit is stopped.
-
15.
公开(公告)号:US20210210774A1
公开(公告)日:2021-07-08
申请号:US17212434
申请日:2021-03-25
Applicant: ENEOS Corporation
Inventor: Akihiko FUKUNAGA , Toshio TEZUKA , Tadashi SEIKE , Hirofumi NISHIO , Daisaku TATEISHI
IPC: H01M8/04089 , H01M8/0606 , H01M8/04082 , C01B3/32
Abstract: According to one aspect of the present invention, an operation method for a hydrogen production apparatus that is disposed in a hydrogen station and produces hydrogen gas to be supplied to a fuel cell vehicle (FCV) arriving at the hydrogen station, the operation method includes starting up a hydrogen production apparatus up to a first operation load ratio preset for a rated operation; increasing an operation load of the hydrogen production apparatus to a second load ratio larger than the first operation load ratio at first timing associated with an arrival of the FCV; and decreasing the operation load of the hydrogen production apparatus to a third operation load ratio smaller than the second operation load ratio at second timing associated with a completion of hydrogen filling into the FCV.
-
-
-
-