OPERATION SCHEDULER FOR A BUILDING AUTOMATION SYSTEM
    12.
    发明申请
    OPERATION SCHEDULER FOR A BUILDING AUTOMATION SYSTEM 有权
    建筑自动化系统的运行调度器

    公开(公告)号:US20120143378A1

    公开(公告)日:2012-06-07

    申请号:US13310484

    申请日:2011-12-02

    IPC分类号: G05B15/02

    摘要: A computer-implemented method for managing and controlling multiple automation components coupled via a building automation network. The computer implemented method includes receiving, via the building automation network, a first operational schedule from a first automation device where the first operational schedule is formatted according to a first protocol, receiving, via the building automation network, a second operational schedule from a second automation device where the second operational schedule is formatted according to a second protocol, converting the received second operational schedule from the second protocol to the first protocol, generating a unified schedule that includes the first operational schedule and the converted second operational schedule, and displaying the unified schedule in a user accessible manner.

    摘要翻译: 一种用于管理和控制通过楼宇自动化网络耦合的多个自动化组件的计算机实现的方法。 计算机实现的方法包括经由建筑物自动化网络接收来自第一自动化设备的第一操作调度,其中根据第一协议对第一操作调度进行格式化,经由楼宇自动化网络从第二自动化设备接收第二操作调度表 自动化设备,其中根据第二协议格式化第二操作调度,将接收到的第二操作调度从第二协议转换为第一协议,生成包括第一操作调度和转换的第二操作调度的统一调度, 以用户可访问的方式统一计划。