公开(公告)号:US20230163673A1
公开(公告)日:2023-05-25
申请号:US18100970
申请日:2023-01-24
Applicant: MAERSK DRILLING A/S
Inventor: John RØN PEDERSEN , Martin SPEIERMANN , Jamshid ZAMANY
CPC classification number: H02K21/222 , H02K11/21 , H02K7/09
Abstract: A flywheel system includes a fixture providing a base and a stator, rotor having a cavity to receive the stator, a generator/motor module having a plurality of permanent magnets mechanically coupled to the rotor and an active magnetic bearing module. The active magnetic bearing module includes a plurality of magnetizable elements mechanically coupled to or integrated in the rotor, and a plurality of electromagnets mechanically coupled to a shaft and configured to magnetically couple with the plurality of first magnetizable elements to actively stabilize the rotor relative to the fixture. The windings of the generator/motor module are arranged around the rotation axis of the rotor at a first distance from the rotation axis of the rotor, the electromagnets of the active magnetic bearing module are arranged around the rotation axis of the rotor at a second distance, and the first distance is greater than or equal to the second distance.
-
公开(公告)号:US11364979B2
公开(公告)日:2022-06-21
申请号:US17176532
申请日:2021-02-16
Applicant: MAERSK DRILLING A/S
Inventor: John Røn Pedersen , Jesper Holck
IPC: E21B7/12 , E21B41/00 , E21B44/00 , E21B47/001 , B63B35/44 , B63B79/00 , G06Q10/00 , B63B79/10 , G06Q50/02
Abstract: A drilling or work-over vessel (10) is disclosed comprising a number of operational equipment (300), wherein the drilling or work-over vessel comprises at least one operational control and/or state unit (100) comprising at least one processing unit (102), wherein the at least one operational control and/or state unit (100) comprises or are in connection with a memory and/or storage (103), and at least one sensor unit (200), wherein the at least one sensor unit (200) is adapted to obtain one or more measured physical values and to provide data representing the one or more measured physical values and/or derived values thereof to the at least one operational control and/or state unit (100), the memory and/or storage (103) comprises a data representation of a computational physics model of at least a part of the drilling or work-over rig, and the at least one processing unit (102) is adapted to derive data representing an estimation of one or more physical states (such as defined by limits of forces, relative motion between operational equipment and vessel, or between other two pieces of operational equipment) estimated to act on at least one operational equipment (300) in response to the data representing the one or more measured physical values and/or derived values thereof as provided by the at least one sensor unit (200).
-
公开(公告)号:US11339615B2
公开(公告)日:2022-05-24
申请号:US16486656
申请日:2018-02-19
Applicant: MAERSK DRILLING A/S
Inventor: Jesper Holck
Abstract: A hoisting system for a drilling rig, which has a crown block for attaching to a derrick, the crown block comprising a plurality of sheaves; a travelling block suspended from the crown block via a hoisting cable, the travelling block comprising a plurality of sheaves and being connectable with a payload, the travelling block being arranged to move along a workpath; the hoisting system further comprising: a floating block comprising a plurality of sheaves reeved on the hoisting cable; wherein the floating block is configured to move between: a first arrangement in which the floating block is fixed relative to the crown block; and a second arrangement in which the floating block is fixed relative to the travelling block; wherein the hoisting system is arranged such that, when the floating block is in one of the first or second arrangement, the sheaves of the floating block overlap a sheave of the crown block or travelling block in a direction of the workpath.
-
公开(公告)号:US20220120146A1
公开(公告)日:2022-04-21
申请号:US17539329
申请日:2021-12-01
Applicant: Maersk Drilling A/S
Inventor: Jesper HOLCK
Abstract: A robotic apparatus (1) for performing drill floor operations comprises a support arrangement (2) and at least one manipulator arm (6). The at least one manipulator arm (6) is configured to carry an end effector (11) configured to manipulate one or more of tubing, tools and/or equipment on a drill floor (d) or pipe deck of an oil and gas rig in order to perform a given drill floor operation.
-
公开(公告)号:US11293236B2
公开(公告)日:2022-04-05
申请号:US16979311
申请日:2019-03-11
Applicant: Maersk Drilling A/S
Inventor: Jesper Holck
Abstract: A robotic apparatus for performing drill floor operations comprises a support arrangement and at least one manipulator arm. The at least one manipulator arm is configured to carry an end effector configured to manipulate one or more of tubing, tools and/or equipment on a drill floor or pipe deck of an oil and gas rig in order to perform a given drill floor operation.
-
公开(公告)号:US20210197935A1
公开(公告)日:2021-07-01
申请号:US17058469
申请日:2018-05-25
Applicant: Maersk Drilling A/S
Inventor: John Røn PEDERSEN , Jan HØFFNER
Abstract: A motion-state dependent method for operating a kinetic generator on a marine vessels or platform includes determining a motion state of the marine vessels or platform, and imposing a limit on at least one of charging and discharging of the kinetic generator based upon the motion state to keep the kinetic generator within a safe operating range.
-
公开(公告)号:US10738543B2
公开(公告)日:2020-08-11
申请号:US15772056
申请日:2016-10-28
Applicant: MAERSK DRILLING A/S
Inventor: William James McBeath
Abstract: Disclosed herein are embodiments of an offshore drilling rig comprising: a drill floor (107) defining a well center (123); a hoisting system configured to advance a tubular string (128) downwards through the well center (123) and to the seafloor (124) and to apply a lifting force to a tubular string (128) extending through the well center (123) and to the seafloor (124), the lifting force being large enough to support at least a major part of an apparent weight of the tubular string (128); and an anti-recoil system (218) configured to cause, in case of a sudden reduction of a load suspended from the drilling rig, the hoisting system to raise the tubular string (128) while preventing damage to the hoisting system.
-
8.
公开(公告)号:US20190169936A1
公开(公告)日:2019-06-06
申请号:US16267522
申请日:2019-02-05
Applicant: MAERSK DRILLING A/S
Inventor: Michael KANNEGAARD
Abstract: An offshore well-processing system includes a mobile offshore drilling unit and a remote well-processing device configured to be positioned on an offshore platform different from the mobile offshore drilling unit, the mobile offshore drilling unit defining at least one well centre and comprising at least one primary drill rig including at least one drill floor and at least one hoisting system for raising and lowering tubular equipment through the at least one well centre from/into a well in the seafloor. The mobile offshore drilling unit and the remote well-processing device are configured to be operationally coupled to each other; and the mobile offshore drilling unit is configured to assist in performing concurrent well-processing tasks on respective wells, including the first well processing task performed by the remote well-processing device on a first well and a second well-processing task concurrently performed by the offshore well-processing system on a second well.
-
公开(公告)号:US10301152B2
公开(公告)日:2019-05-28
申请号:US15471970
申请日:2017-03-28
Applicant: Maersk Drilling A/S
Inventor: Jesper Holck
Abstract: An offshore floating vessel includes a hoisting system including a drive for moving connecting device and emergency brakes to inhibit motion of the connecting device; wherein the hoisting system is to be operated at least in a hoisting mode and in an active heave compensation mode; wherein hoisting system is to perform an active heave compensation when operated in the active heave compensation mode and to operate without active heave compensation when operated in the hoisting mode; wherein the emergency brakes are operable in a normally-energized mode including a de-energized state where the emergency brakes engage so as to inhibit motion of the connecting device relative to the floating vessel; wherein each emergency brake of the plurality of hydraulic emergency brakes has associated with it a separate accumulator reservoir.
-
公开(公告)号:US09856705B2
公开(公告)日:2018-01-02
申请号:US14760440
申请日:2014-01-13
Applicant: Maersk Drilling A/S
Inventor: Michael Kannegaard , Allan McColl
CPC classification number: E21B19/002 , E21B15/02 , E21B19/143 , E21B19/155
Abstract: Embodiments of an offshore drilling rig including—a drill floor deck having a hole defining a first well center;—a first mast upwardly extending relative to the drill floor deck;—a first hoisting system supported by the first mast and configured for hoisting and lowering tubular equipment through the first well center; wherein the load bearing structure of the first hoisting system is displaced from and located on a first side of the first well center;—first pipe handling equipment for moving tubular equipment to the first hoisting system so as to allow the first hoisting system to hoist or lower the tubular equipment through the first well center; wherein the first pipe handling equipment is operable to move tubular equipment at least partly underneath the load bearing structure and/or through a gap formed in said load bearing structure.
-
-
-
-
-
-
-
-
-