摘要:
An apparatus for reducing energy consumption in monitoring means of a plurality of piezoelectric components comprises a plurality of piezoelectric components as well as monitoring means for monitoring the status of the piezoelectric components. The monitoring means have two states namely active and inactive. The piezoelectric components are connected in parallel to each other. A current detecting circuit comprises a switch and a resistor that is connected in parallel to the switch. A controller having two states that are active and inactive. The controller is configured to open the switch in response to the controller being in the inactive state and to close the switch in response to the controller being in the active state. The closing of the switch triggers a state change in the monitoring means from their inactive state to their active state.
摘要:
A system for automatically detecting status of an agent in a call center is provided. The system may have a call center management system with a plurality of agent workstations coupled to the call center management system and a plurality of telephones associated with the agent workstations. The system may also have a switch that automatically connects calls to the telephones. An off-hook detector automatically detects a manually initiated off-hook status of at least one of the telephones and signals the switch that the agent at the telephones is unavailable. The switch may then avoid connecting a call to the unavailable agent.
摘要:
A dice game utilizes a playing card and game playing elements. Each player in sequence rolls the dice and places a game playing element on the playing card corresponding to the value displayed on the rolled dice. If the player has previously rolled this number, the number may be used by the next player in sequence who needs this number. If a player rolls a 7, he or she forfeits their turn and must remove a game playing element from one of the covered numbers on their playing card. The first person to have all of the numbers on the playing card covered wins the game and the contents of the winner's pot.
摘要:
Automatically accepting applications, and testing, training, certifying, assigning, allocating, controlling, and scheduling remote agents. An applicant (100) transmits an application to a remote agent center (RAC) (130) via a Communications Network (120). The application contains the person's profile, training, and experience. The RAC validates the skills via testing or third party confirmation, accepts the person as a remote worker, certifies the person's skill levels, and places the person in the remote worker pool. The remote worker can also obtain remote training on new or additional topics. The RAC evaluates the business demands of an external party, identifies remote workers with the needed skills who are available, and transmits the work at the appropriate time to the remote workers. The work is transmitted via or through the RAC. The external parties thus do not have to recruit, train, or test persons, or be concerned with staffing issues.