IMPLANTABLE ANTENNA ASSEMBLIES
    4.
    发明申请
    IMPLANTABLE ANTENNA ASSEMBLIES 有权
    可植入天线组合

    公开(公告)号:US20150025613A1

    公开(公告)日:2015-01-22

    申请号:US14384339

    申请日:2012-03-29

    Abstract: An implantable antenna assembly includes a multilayer flexible printed circuit board comprising a first flexible substrate, second flexible substrate, and third flexible substrate. An inductor coil is formed by electrically conductive traces disposed on the first flexible substrate. A shield is formed by electrically conductive traces disposed on the second flexible substrate and third flexible substrate, the shield surrounding the inductor coil. A method for forming an implantable antenna assembly is also provided.

    Abstract translation: 可植入天线组件包括多层柔性印刷电路板,其包括第一柔性基板,第二柔性基板和第三柔性基板。 电感线圈由设置在第一柔性基板上的导电迹线形成。 通过布置在第二柔性基板和第三柔性基板上的导电迹线形成屏蔽,围绕电感线圈的屏蔽层。 还提供了一种用于形成可植入天线组件的方法。

    SYSTEM AND METHOD FOR COMPLEX SCHEDULE GENERATION
    7.
    发明申请
    SYSTEM AND METHOD FOR COMPLEX SCHEDULE GENERATION 有权
    复杂时间表生成的系统和方法

    公开(公告)号:US20100153170A1

    公开(公告)日:2010-06-17

    申请号:US12612487

    申请日:2009-11-04

    Abstract: A system and method for generating a schedule for multiple employees in a complex environment. In one embodiment, the method includes generating a schedule for multiple employees with varying skill sets for a time period, wherein the plurality of employees have varying overlapping skill sets that enable them to perform various tasks, and wherein employees are shared across tasks within the time period. In one embodiment, the method includes receiving a plurality of user inputs to a scheduling program, including a number of employee designations that each refer to a unique employee, and a number of skill sets that each correspond to one of the employee designations. The method further includes receiving a user input that changes the number of employee designations by indicating at least one changed employee, and estimating an effect of the at least one changed employee on effective staffing levels for each of the various tasks. The method further includes generating estimated effective staffing levels for each of the various tasks.

    Abstract translation: 一种用于在复杂环境中为多名员工生成计划的系统和方法。 在一个实施例中,该方法包括为一段时间内具有变化的技能组的多个雇员生成时间表,其中多个雇员具有变化的重叠技能组,使得他们能够执行各种任务,并且其中员工在该时间内跨任务共享 期。 在一个实施例中,该方法包括:向调度程序接收多个用户输入,其包括每个指向唯一雇员的多个员工指定,以及每个对应于员工指定之一的多个技能组。 该方法还包括接收通过指示至少一个变更的雇员来改变雇员指定数量的用户输入,以及估计至少一个改变的雇员对于各种任务中的每一个的有效人员配置水平的影响。 该方法还包括为每个各种任务产生估计的有效人员配置水平。

Patent Agency Ranking